The requirement for this assignment is to conduct a risk assessment of the Grand Gulf Nuclear Station Unit 1 facility in Mississippi using the FEMA model outlined in the FEMA publication, Risk Assessment: A How-to Guide to Mitigate Potential Terrorist Attacks Against Buildings (see supporting document attached titled “FEMA Risk Assessment Process”):https://www.fema.gov/fema-452-risk-assessment-how-guide-mitigate-potential-terrorist-attacks-against-buildingshttps://www.nrc.gov/info-finder/reactors/gg1.htmlThe paper will consist of an explanation of each step of the risk assessment process (each step is covered in the \”FEMA Risk Assessment Process\” attachment) as it relates to the Grand Gulf Nuclear Station Unit 1 facility in Mississippi and it will be 9 full pages in length. The process consists of the following steps:• threat identification and rating• asset value assessment• vulnerability assessment• risk assessment• consider mitigation options
